The room: turning a shell into a restaurant that works at 8pm
A restaurant build-out is a sequence of irreversible decisions. The floor goes down once. The duct goes where the wall allows. The furniture arrives last and cannot fix a room that was laid out wrong.
Get the flow right and the finishes can be modest. Get the flow wrong and no finish will save the service.
Five dimensions that decide the room
Seat depth, table spacing, aisle width, bar clearance and the distance from the pass to the furthest table. These five numbers decide comfort, service speed and how many covers you can honestly sell.
Most first-time layouts steal from the aisle to add a table. The result is a room that seats two more and serves four fewer, because servers cannot pass and guests cannot leave.
- Aisle: wide enough for a server carrying a tray to pass a seated guest.
- Table spacing: enough that a chair can be pulled out without moving the neighbour.
- Pass distance: short enough that food is still hot at the last table.
- Bar clearance: enough for two people to stand and one to pass.
- Back of house: a route from delivery to store that never crosses the dirty dish route.
Services before surfaces
The mechanical and electrical design decides what the kitchen can be. Extraction, make-up air, gas load, water heating, drainage falls and electrical capacity are all cheaper to change on paper than in a finished room.
Commission the design as one package with the kitchen equipment layout. When extraction is designed separately from the cooking line, the result is a hood that does not cover the appliances that were later selected.
- Confirm the incoming electrical capacity before the equipment list is final.
- Design extraction and make-up air together, and check the discharge route.
- Agree floor falls and drainage before the screed.
- Leave access to every valve, isolator and grease trap.
Buying equipment you can keep alive
The purchase price is a fraction of the cost. Service network, parts availability and whether a local engineer will answer on a Saturday decide the real number.
For furniture in a commercial room, ask for the test standard, the cycle count and whether the finish can be reordered in three years. A chair that cannot be matched later becomes a mismatched set.
- Who services it, and how far away are they?
- Which parts fail first, and are they stocked locally?
- Can the finish be reproduced, in the same batch specification, later?
- What is the lead time for a replacement unit, mid-season?
| Decision | Cost of getting it wrong | When it must be settled |
|---|---|---|
| Extraction route | Weeks of delay, or a menu you cannot cook | Before lease signature |
| Electrical capacity | Upgrade at your cost, after the walls close | Before equipment order |
| Drainage falls | Water on the floor every service | Before screed |
| Furniture spec | Mismatched sets, early failure | Before the first delivery |
The most expensive habit is choosing finishes before the layout is fixed. A tile chosen for a photograph dictates the floor build-up, which dictates the door threshold, which dictates whether a trolley can get into the kitchen.
Answers in this section
Publishing now. The first answers publish from 2026-12-14. This section is being filled in order, one topic at a time, so that every page you land on is already complete.
How long does a fit-out take?
Less than the delays. A modest room can be built in eight to twelve weeks once permits are issued; the waiting is in design, consent and utility connections.
Should I buy new or refurbished equipment?
New for anything on the critical path of a service, refurbished for storage and non-critical items. A failing cold room costs more in one night than it saved.
Do I need an architect?
You need someone who owns the drawing set and the coordination. Whether that is an architect, a kitchen designer or a good contractor depends on the size of the job.