The questions behind the worry

The money: what it costs to open, and where it quietly leaks

Almost nobody runs out of money on opening day. They run out in month five to nine, when the build is paid for, the deposits are spent, and the room is doing 60 per cent of the covers the plan promised.

This page is the money question broken into parts you can actually act on: what the build eats, what the first quarter eats, and which line items have a habit of doubling without anyone deciding they should.

Three numbers, not one

Owners usually carry a single figure in their head, the total. The total is the least useful of the three. What matters is the split between build cost, opening cost and working capital, because each one behaves differently when it goes over.

Build overruns arrive as change orders and land before you open. Opening costs arrive as small decisions, plates, uniforms, a second POS, and land in the last three weeks when you are least able to argue. Working capital does not arrive at all. It gets eaten, slowly, by a gap between the day you start paying staff and the day the room earns enough to cover them.

What the build actually eats

The line items that surprise first-time owners are almost never the ones on the quote. They are the ones that were never quoted because nobody knew they were needed: grease interceptor, make-up air, a floor that has to be re-screeded before tiling, an electrical service that cannot carry the kitchen you drew.

The second surprise is sequence. A kitchen waiting on a gas connection holds up the floor, which holds up the furniture delivery, which holds up hiring. Every week of that chain costs rent without revenue. Treat the utility connections as the schedule, not the joinery.

The three leaks that close restaurants

First, labour scheduled to the plan instead of to the takings. Second, a menu whose food cost was calculated at supplier prices you no longer get. Third, discounting that fills seats without covering the marginal hour.

None of these show up as a crisis. They show up as a bank balance that is always about two weeks short, no matter how busy Friday looked.

DecisionWhat to write downWhat it protects
ContingencyA percentage of build, held in a separate accountThe change orders you cannot refuse
RunwayWeeks of full payroll, not a cash figureThe month the room underperforms
Break-evenCovers per service at your real average ticketEvery pricing conversation after that
Supplier termsDays to pay versus days to be paidThe week both land on the same Friday

The commonest mistake is sizing working capital against the plan rather than against a bad month. A plan has the room at 80 per cent of capacity by week six. Reality has it there by week fourteen. The gap between those two curves is the number to fund.

Answers in this section

Publishing now. The first answers publish from 2026-11-30. This section is being filled in order, one topic at a time, so that every page you land on is already complete.

Questions that come up on this page

How much should I hold back as contingency?

Enough that a 15 to 20 per cent build overrun does not stop the opening. On a fit-out that is the difference between opening on the planned date and opening six weeks late with rent running.

Should I borrow for the build or for the runway?

For the runway, if you can only do one. A build loan is secured against assets that are worth less the day after installation. Working capital is what keeps the doors open while the room finds its rhythm.

When does a restaurant actually become profitable?

Later than the spreadsheet says. The first quarter pays for the learning curve, the second for the corrections. Judge the business on month nine, not month three.