NEYIContract furniture
The questions behind the worry

The site: how to read a lease before it reads you

A site is not a postcode. It is a door, a kitchen you are allowed to build, and a contract that lasts longer than most marriages.

The questions below are the ones owners ask after they have signed, which is the wrong order. Read this page before the viewing, and read the lease with the same suspicion you would apply to a supplier who quotes half the market rate.

Judge the door, not the street

Footfall counts tell you how many people walk past. They do not tell you how many can see your door, want what you sell at that hour, and are willing to change direction. Stand outside at the three hours that matter to your concept and count the people who look at the frontage, not the people who pass it.

Frontage width matters more than floor area for a first site. A narrow door on a busy street reads as a queue; a wide door on the same street reads as a room. Permission for a pavement licence or a sign that projects is worth real money, and it is often a separate application from the one you already made.

The kitchen permission question

You do not need the kitchen you want. You need the kitchen the building can carry. Extraction route, gas capacity, water pressure, floor drains, noise limits and opening hours are all decided before you arrive, and each one can remove a section of your menu.

Get the answers in writing before you negotiate rent, because they change what the site is worth to you. A unit with no route for ductwork is not a restaurant site, whatever the agent says about the previous tenant.

Six clauses worth arguing about

Rent is the number everyone negotiates and the one that matters least over a ten-year term. The clauses that decide your fate are the ones about what happens when things go wrong.

ClauseWhat owners get wrongWhat to ask for
Rent reviewAssuming it can go downCap it, or go index-linked
BreakSigning without oneA mutual break at year five
RepairAccepting a full repairing lease on an old buildingA schedule of condition at handover
AlterationsFitting out before consentWritten consent, with the duct route named

The most expensive mistake is treating the agent's schedule as a survey. Commission your own, including a drainage camera and an electrical load test. It costs a fraction of one month's rent and it is the only document that will help you when the landlord disagrees.

Answers in this section

Publishing now. The first answers publish from 2026-12-01. This section is being filled in order, one topic at a time, so that every page you land on is already complete.

Questions that come up on this page

Is a corner site always better?

No. A corner gives two frontages and usually two sets of rates. It helps a concept that wants to be seen and hurts one that depends on a tight, quiet room.

How long should the first lease be?

Long enough to amortise the fit-out, short enough to escape a mistake. Most first-time owners are better served by a shorter term with a renewal option than by a long term with a discount.

What if the previous tenant was also a restaurant?

Then the extraction, drainage and gas are probably already there, which is worth real money. Check whether the equipment was removed properly and whether the grease trap was serviced, not just installed.